Part of Speech: n.
Quotation: First, what the loggers call a stumper uses its arm to chop down some trees. The first batch of trees, from the start line to the edge of the property line, are laid across the swamp. The stumper’s large, tank-like track tires distribute the weight enough to let it tiptoe across the trees it has just put down. Once a road of about five layers is built, the other machinery, 25-ton tree-toters, carry the timber back to a loading dock. At the dock, small cranes hoist the tree carcasses, dip them onto a saw and then drop them into a tractor-trailer. Finally, the stumper picks up the trees it used for a bridge on the swampy land and loads them onto a truck. This job, which will take about three weeks to finish, will yield about 80 truckloads a week.
Author:
John Ramsey
Publishing Location:
Fayetteville, North Carolina
Date of Publication:
Aug. 20, 2008
This catchword has yet to be researched.